Richmond, VA
Enroughty was selected as the coating contractor for this design-build project. Designed specifically for Phillip Morris USA The WaterHub reduces water usage by 40% and eliminates more than 50% of wastewater discharge. The painting scope for this project included preparation and painting of all facility surfaces from corrugated ceilings and trusses to epoxy floors. With new construction projects we have a chance to protect an owner’s investment from the start and we value our relationships and partners within the Water and Wastewater Industry.