Enroughty was awarded 350 linear ft. of an Infrastructure project that consisted of abrasive blasting and coating all carbon steel columns, beams, cross beams, and angles throughout the pipe bridge. Containment in the abrasive blasting process is critical when preparing a surface. There are several factors that go into ensuring containment throughout the process such as environmental controls, Personal Protective Equipment, training, and monitoring. Our crews were successfully able to contain the blast media using 12 mil poly material and apply a three-coat protective coating system on all carbon steel.